UCF STIG Viewer Logo
Changes are coming to https://stigviewer.com. Take our survey to help us understand your usage and how we can better serve you in the future.
Take Survey

Protected Distribution System (PDS) Construction - Sealed Joints


Overview

Finding ID Version Rule ID IA Controls Severity
V-30949 CS-04.02.02 SV-40991r3_rule DCSR-3 ECCT-2 PESS-1 Medium
Description
A PDS that is not constructed and sealed as required could result in the undetected interception of classified information. Sealing of joints is necessary to ensure that daily visual inspections of the PDS for signs of attempted or actual intrusion can be accurately and thoroughly conducted.
STIG Date
Traditional Security 2013-07-11

Details

Check Text ( C-39611r3_chk )
Check to ensure:
1. All PDS seams and connectors are permanently sealed completely around all surfaces (e.g., welding (continuous or track), compression, epoxy, fusion, etc.).

2. If pull boxes are used, check that the pull-box covers are sealed to the pull boxes completely around the mating surfaces.

3. Boxes with prepunched knockouts are not be used.

NOTE: If a pre-fabricated (Modular types such as Holocom or Wiremold) PDS is used it is also required to have all joints sealed as specified above.
Fix Text (F-34761r3_fix)
1. All PDS seams and connectors must be permanently sealed *completely around* all surfaces (e.g., welding (continuous or track), compression, epoxy, fusion, etc.).

2. If pull boxes are used the pull-box covers must be sealed to the pull boxes *completely around* the mating surfaces.

3. Boxes with prepunched knockouts must not be used.

NOTE: If a pre-fabricated (Modular type, such as Holocom or Wiremold) PDS is used it is also required to have all joints sealed as specified above.