UCF STIG Viewer Logo
Changes are coming to https://stigviewer.com. Take our survey to help us understand your usage and how we can better serve you in the future.
Take Survey

Products collecting baselines for anomaly-based detection must have their baselines rebuilt based on changes to mission requirements such as Information Operations Conditions (INFOCON) levels and when the traffic patterns are expected to change significantly.


Overview

Finding ID Version Rule ID IA Controls Severity
V-251341 NET-IDPS-027 SV-251341r805978_rule Low
Description
Administrators should ensure that any products collecting baselines for anomaly-based detection have their baselines rebuilt periodically as needed to support accurate detection. The ISSM is required to have the enclave prepared for readiness by raising INFOCON levels prior to an activity to ensure the network is as ready as possible when the operation or exercise begins. Because system and network administrators implement many of the INFOCON measures over a period of time in a pre-determined operational rhythm, commanders should raise INFOCON levels early enough to ensure completion of at least one cycle before the operational activity begins. Recommendations for possible INFOCON changes should be written into Operation Plans (OPLAN) and Concept Plans (CONPLAN). Guidelines can be found in Strategic Command Directive (SD) 527-1.
STIG Date
Network Infrastructure Policy Security Technical Implementation Guide 2021-11-22

Details

Check Text ( C-54776r805976_chk )
Interview the IDPS administrator and determine if anomaly-based detection is deployed in the network. If implemented, ensure that any products collecting baselines for anomaly-based detection have their baselines rebuilt periodically to support accurate detection.

If the collection products do not have their baselines rebuilt periodically, this is a finding.
Fix Text (F-54729r805977_fix)
Establish procedures to update anomaly-based sensors.