UCF STIG Viewer Logo

Power On Reset (POR) Procedures must be documented for each system.


Overview

Finding ID Version Rule ID IA Controls Severity
V-256854 HMCP0110 SV-256854r890908_rule Low
Description
If procedures for performing PORs are not in place, it is extremely difficult to ensure overall operating system integrity
STIG Date
IBM Hardware Management Console (HMC) Policies Security Technical Implementation Guide 2023-03-20

Details

Check Text ( C-60529r890906_chk )
Review the POR procedures with the System Administrator.
Review documentation for completeness and accuracy.

If no documentation exists, this is a FINDING



Fix Text (F-60472r890907_fix)
Create or refine procedures for performing PORs.