UCF STIG Viewer Logo
Changes are coming to https://stigviewer.com. Take our survey to help us understand your usage and how we can better serve you in the future.
Take Survey

The Test Manager will ensure test procedures are created and at least annually executed to ensure system initialization, shutdown, and aborts are configured to ensure the system remains in a secure state.


Overview

Finding ID Version Rule ID IA Controls Severity
V-16827 APP5060 SV-17827r1_rule DCSS-2 Medium
Description
Secure state assurance cannot be accomplished without testing the system state at least annually to ensure the system remains in a secure state upon intialization, shutdown and abort.
STIG Date
Application Security and Development Checklist 2013-07-16

Details

Check Text ( C-17826r1_chk )
Ask the application representative to provide tests plans, procedures and results to ensure system initialization, shutdown, and aborts keep the system in a secure state.

If the application is a COTS/GOTS product or is composed of only COTS/GOTS products with no custom code, this check does not apply unless the application is being reviewed by or in conjunction with the COTS/GOTS vendor in which case this check is applicable.

1) If test plans, procedures, and results do not exist ,or at least executed annually, it is a finding.
Fix Text (F-17144r1_fix)
Correct errors in initialization, shutdown, and aborts leaving the system in an unsecure state.