UCF STIG Viewer Logo
Changes are coming to https://stigviewer.com. Take our survey to help us understand your usage and how we can better serve you in the future.
Take Survey

PEMS-1 Master Power Switch


Overview

A master power switch or emergency cut-off switch to IT equipment is present. It is located near the main entrance of the IT area and it is labeled and protected by a cover to prevent accidental shut-off.

MAC / CONF Impact Subject Area
MACI
MACII
MACIII
High Physical and Environmental

Details

Threat
IT assets are at risk to electrical damage if a master power switch is not available or operational at a critical moment.

Guidance
1. A master power switch or emergency cut-off switch to IT equipment shall be present in the facility.
2. A master power switch or emergency cut-off switch to IT equipment shall be located near the main entrance of the IT area.
3. A master power switch or emergency cut-off switch to IT equipment shall be protected by a cover to prevent accidental shut-off.
4. Testing of the master power switch or emergency cut-off switch shall be tested in accordance with building code regulations.

References

    N/A